Wapro logo..png

Learn about Low cost of ownership with WAPRO in this DHA Tip for the Day!

Learn about WAPRO’s fast lead times in the DHA Tip for the Day.

With two warehouse locations stocked with the most popular sizes from 4" to 36" check valves, Wapro offers quick 1 to 2 week lead times.

Time spent on installation adds to cost. WaStop can be installed quickly and easily with minimal equipment required. A standard installation takes roughly 30-60 minutes, depending on size. Most municipalities/councils can install the WaStop valves themselves without the need for a contractor.

This helps reduce costs and allows more flexibility in installation.

Learn about WAPRO’s four month free trial for municipalities in this DHA Tip for the Day!